{"id":3444,"date":"2023-09-12T12:40:29","date_gmt":"2023-09-12T11:40:29","guid":{"rendered":"https:\/\/kalamperconstruction.com\/k-residence-progress-of-works-september-2023\/"},"modified":"2023-09-12T13:10:35","modified_gmt":"2023-09-12T12:10:35","slug":"k-residence-progress-of-works-september-2023","status":"publish","type":"post","link":"https:\/\/kalamperconstruction.com\/en\/k-residence-progress-of-works-september-2023\/","title":{"rendered":"K Residence, Progress of works &#8211; September 2023"},"content":{"rendered":"\n<p>The work on our K Residence project is progressing successfully and quickly and we are happy to share with you information about the situation on the ground.<\/p>\n\n<p>The construction site is very active and exciting, and our team started concreting the slab above the garage at the beginning of September.<\/p>\n\n<p>Speed, quality of construction, as well as a high level of professionalism distinguish each stage of our work. <\/p>\n\n<p>We follow new trends and use the most modern materials to make your new home comfortable, functional and of course, aesthetically appealing.<\/p>\n\n<p>The camera recorded the progress of the works from the field and from the area and we are happy to share it with you.<\/p>\n\n          \n\n          <figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\">\n            <div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Napredak radova na poslovno-stambenom objektu K Residence u Baru\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/sBfZx3BOW3Y?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen><\/iframe>\n<\/div>\n          <\/figure>\n          \n\n        \n","protected":false},"excerpt":{"rendered":"<p>The work on our K Residence project is progressing successfully and quickly and we are happy to share with you information about the situation on the ground. The construction site is very active and exciting, and our team started concreting the slab above the garage at the beginning of September. Speed, quality of construction, as [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-3444","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=3444"}],"version-history":[{"count":1,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3444\/revisions"}],"predecessor-version":[{"id":3445,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3444\/revisions\/3445"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media\/3443"}],"wp:attachment":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=3444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=3444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/tags?post=3444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}