{"id":3815,"date":"2024-04-23T12:19:23","date_gmt":"2024-04-23T11:19:23","guid":{"rendered":"https:\/\/kalamperconstruction.com\/progress-report-on-k-residence-april-2024\/"},"modified":"2024-04-23T12:21:17","modified_gmt":"2024-04-23T11:21:17","slug":"progress-report-on-k-residence-april-2024","status":"publish","type":"post","link":"https:\/\/kalamperconstruction.com\/en\/progress-report-on-k-residence-april-2024\/","title":{"rendered":"Progress Report on K Residence \u2013 April 2024"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">During April, work on the K Residence project has progressed rapidly and successfully, and we are pleased to share the latest updates from the construction site with you.<\/p>\n\n<p class=\"wp-block-paragraph\">The pouring of the seventh-floor slab is in full swing, as well as the construction work on the third floor. Additionally, plumbing installations on the third floor have also commenced.<\/p>\n\n<p class=\"wp-block-paragraph\">The works are progressing excellently, and our building is already taking on the outlines of its planned appearance.<\/p>\n\n<p class=\"wp-block-paragraph\">We continue to monitor the progress of the works and will keep you informed of the status of our project in May!<\/p>\n\n<figure class=\"wp-block-video\"><video height=\"480\" style=\"aspect-ratio: 848 \/ 480;\" width=\"848\" controls=\"\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/kalamper.mp4\"><\/video><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>During April, work on the K Residence project has progressed rapidly and successfully, and we are pleased to share the latest updates from the construction site with you. The pouring of the seventh-floor slab is in full swing, as well as the construction work on the third floor. Additionally, plumbing installations on the third floor [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3811,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-3815","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=3815"}],"version-history":[{"count":1,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3815\/revisions"}],"predecessor-version":[{"id":3816,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3815\/revisions\/3816"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media\/3811"}],"wp:attachment":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=3815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=3815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/tags?post=3815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}