{"id":3828,"date":"2024-05-20T08:01:41","date_gmt":"2024-05-20T07:01:41","guid":{"rendered":"https:\/\/kalamperconstruction.com\/k-residence-construction-progress-may-2024\/"},"modified":"2024-05-20T10:26:54","modified_gmt":"2024-05-20T09:26:54","slug":"k-residence-construction-progress-may-2024","status":"publish","type":"post","link":"https:\/\/kalamperconstruction.com\/en\/k-residence-construction-progress-may-2024\/","title":{"rendered":"K Residence \u2013 Construction Progress &#8211; May 2024"},"content":{"rendered":"\n<p>At the K Residence construction site, work is progressing successfully and quickly, and we are pleased to share the latest updates with you.<\/p>\n\n<p>Water supply, electricity, and air conditioning installations have been completed on the first floor, and the same tasks are currently being carried out on the second and third floors.<\/p>\n\n<p>Masonry work on the fourth floor is underway, and we expect it to be completed soon.<\/p>\n\n<p>Our construction site is becoming more dynamic each month, and we are proud that the work is proceeding as planned.<\/p>\n\n<p>If you haven&#8217;t already, check out the available apartments and choose one that suits you in the most beautiful building in Bar.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/3-3.jpg\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1280\" height=\"959\" data-id=\"3825\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/3-3.jpg\" alt=\"\" class=\"wp-image-3825\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/2-3.jpg\"><img decoding=\"async\" width=\"1280\" height=\"959\" data-id=\"3823\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/2-3.jpg\" alt=\"\" class=\"wp-image-3823\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/1-4.jpg\"><img decoding=\"async\" width=\"1280\" height=\"959\" data-id=\"3821\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/1-4.jpg\" alt=\"\" class=\"wp-image-3821\"\/><\/a><\/figure>\n<\/figure>\n\n          \n\n          <figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\">\n            <div class=\"wp-block-embed__wrapper\">\n<iframe title=\"K residence   maj 2024\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/hS475RIe9Z4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div>\n          <\/figure>\n          \n\n        \n","protected":false},"excerpt":{"rendered":"<p>At the K Residence construction site, work is progressing successfully and quickly, and we are pleased to share the latest updates with you. Water supply, electricity, and air conditioning installations have been completed on the first floor, and the same tasks are currently being carried out on the second and third floors. Masonry work on [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3826,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-3828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=3828"}],"version-history":[{"count":2,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3828\/revisions"}],"predecessor-version":[{"id":3831,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3828\/revisions\/3831"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media\/3826"}],"wp:attachment":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=3828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=3828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/tags?post=3828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}