{"id":3992,"date":"2025-02-13T16:48:22","date_gmt":"2025-02-13T15:48:22","guid":{"rendered":"https:\/\/kalamperconstruction.com\/work-progress-at-k-residence-construction-site-february-2025\/"},"modified":"2025-02-13T16:52:04","modified_gmt":"2025-02-13T15:52:04","slug":"work-progress-at-k-residence-construction-site-february-2025","status":"publish","type":"post","link":"https:\/\/kalamperconstruction.com\/en\/work-progress-at-k-residence-construction-site-february-2025\/","title":{"rendered":"Work Progress at K Residence construction site \u2013 February 2025."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Welcome to another monthly progress review of the construction work at K Residence. We are making steady progress toward achieving our project goals, and every day brings us one step closer to your new home. <\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Water installation is being completed on the 11th floor <\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Styrofoam for the fa\u00e7ade has been installed up to the 10th floor <\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Metalwork installation is in progress on the 10th floor <\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Plastering is underway on the 10th floor <\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Drywall work and preparation for insulation before tiling are in progress on the 8th floor<\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Tiling is currently being installed on the 7th floor <\/p>\n\n<p class=\"wp-block-paragraph\">&#8211; Smoothing of the first four floors is complete \u2013 painting will begin soon <\/p>\n\n<p class=\"wp-block-paragraph\">We are progressing as planned and getting closer to completion!<\/p>\n\n<p class=\"wp-block-paragraph\">\n          <br\/>\n        <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Welcome to another monthly progress review of the construction work at K Residence. We are making steady progress toward achieving our project goals, and every day brings us one step closer to your new home. &#8211; Water installation is being completed on the 11th floor &#8211; Styrofoam for the fa\u00e7ade has been installed up to [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3986,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-3992","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=3992"}],"version-history":[{"count":1,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3992\/revisions"}],"predecessor-version":[{"id":3993,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/3992\/revisions\/3993"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media\/3986"}],"wp:attachment":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=3992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=3992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/tags?post=3992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}