{"id":4749,"date":"2026-04-17T07:58:35","date_gmt":"2026-04-17T06:58:35","guid":{"rendered":"https:\/\/kalamperconstruction.com\/k-home-construction-progress-april-2026\/"},"modified":"2026-04-17T08:03:50","modified_gmt":"2026-04-17T07:03:50","slug":"k-home-construction-progress-april-2026","status":"publish","type":"post","link":"https:\/\/kalamperconstruction.com\/en\/k-home-construction-progress-april-2026\/","title":{"rendered":"K Home \u2013 Construction progress, April 2026"},"content":{"rendered":"\n<p>We are pleased to inform you about the latest progress on our project. In line with the planned schedule, important construction phases have been successfully completed during the previous period. <\/p>\n\n<p>Works on the foundation slab, as well as the industrial flooring on garage level -2, have been successfully completed. All reinforced concrete walls have also been executed, while the concreting of the second slab has been successfully finalized. <\/p>\n\n<p>At the same time, works on the industrial flooring on garage level -1 have also been completed.<\/p>\n\n<p>Construction activities are progressing according to plan, with full compliance to all technical standards and a high level of build quality. We will continue to keep you regularly informed about further progress and current developments on the construction site. <\/p>\n\n<figure class=\"wp-block-image size-large\"><a href=\"&lt;!--[CDATA[https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-HOME-WEBP-april1.webp]]--&gt;\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1400\" height=\"1080\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-HOME-WEBP-april1.webp\" alt=\"\" class=\"wp-image-4746\"\/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We are pleased to inform you about the latest progress on our project. In line with the planned schedule, important construction phases have been successfully completed during the previous period. Works on the foundation slab, as well as the industrial flooring on garage level -2, have been successfully completed. All reinforced concrete walls have also [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4745,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-4749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/4749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=4749"}],"version-history":[{"count":1,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/4749\/revisions"}],"predecessor-version":[{"id":4750,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/4749\/revisions\/4750"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media\/4745"}],"wp:attachment":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=4749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=4749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/tags?post=4749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}