{"id":4968,"date":"2026-10-30T18:33:57","date_gmt":"2026-10-30T17:33:57","guid":{"rendered":"https:\/\/kalamperconstruction.com\/k-home-construction-progress-october-2026\/"},"modified":"2026-11-05T10:02:57","modified_gmt":"2026-11-05T09:02:57","slug":"k-home-construction-progress-october-2026","status":"publish","type":"post","link":"https:\/\/kalamperconstruction.com\/en\/k-home-construction-progress-october-2026\/","title":{"rendered":"K Home \u2013 Construction progress, October 2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">We are pleased to inform you that the concreting of the building\u2019s final floor slab at K Home has been successfully completed, marking another significant milestone in the structural construction phase.<\/p>\n\n<p class=\"wp-block-paragraph\">At the same time, masonry work up to the third floor has been completed, along with the installation of water supply systems and Grohe concealed installation bodies.<\/p>\n\n<p class=\"wp-block-paragraph\">Electrical and air conditioning installation works are currently underway, following the planned construction schedule and in accordance with the project\u2019s technical specifications.<\/p>\n\n<p class=\"wp-block-paragraph\">We will continue to keep you informed about the progress of the project.<\/p>\n\n<p class=\"wp-block-paragraph\">Thank you for your trust.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/DJI_20261029144028_0020_D.jpg\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1920\" height=\"1440\" data-id=\"4965\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/DJI_20261029144028_0020_D.jpg\" alt=\"\" class=\"wp-image-4965\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-5.jpeg\"><img decoding=\"async\" width=\"960\" height=\"1280\" data-id=\"4963\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-5.jpeg\" alt=\"\" class=\"wp-image-4963\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-4.jpeg\"><img decoding=\"async\" width=\"960\" height=\"1280\" data-id=\"4961\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-4.jpeg\" alt=\"\" class=\"wp-image-4961\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-3.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"1280\" data-id=\"4959\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-3.jpeg\" alt=\"\" class=\"wp-image-4959\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-2.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"1280\" data-id=\"4957\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-2.jpeg\" alt=\"\" class=\"wp-image-4957\"\/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-1.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"1280\" data-id=\"4955\" src=\"https:\/\/kalamperconstruction.com\/wp-content\/uploads\/K-Home-Oktobar-1.jpeg\" alt=\"\" class=\"wp-image-4955\"\/><\/a><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We are pleased to inform you that the concreting of the building\u2019s final floor slab at K Home has been successfully completed, marking another significant milestone in the structural construction phase. At the same time, masonry work up to the third floor has been completed, along with the installation of water supply systems and Grohe [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4966,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-4968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/4968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=4968"}],"version-history":[{"count":1,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/4968\/revisions"}],"predecessor-version":[{"id":4969,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/posts\/4968\/revisions\/4969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media\/4966"}],"wp:attachment":[{"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=4968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=4968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kalamperconstruction.com\/en\/wp-json\/wp\/v2\/tags?post=4968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}