We are pleased to inform you that construction of your future home is progressing successfully and according to the planned schedule.
Significant advancements have been made recently, particularly in the final stages of both interior and exterior works:
- Tiling on the top floor is in its final phase, meaning that all bathrooms and kitchens will soon be fully finished.
- The roof structure is completed, making the building fully enclosed and protected.
- Parquet flooring and interior doors have been installed on the first four floors, marking a major step toward completion of those units.
- The fifth and sixth floors are currently being prepared for parquet installation, after which the doors will be installed.
- The facade base layer is ready, and work on the exterior appearance of the building will begin shortly.
- Wall smoothing on the seventh floor has been completed, enabling the continuation of interior finishing in that part of the building.
Thank you for your continued trust.